Electric Vehicle (EV) Charging Program
Dakota Valley Electric offers an EV charging rate during the hours of 10:00 P.M. and 6:00 A.M. To qualify for the rate a member must install a submeter for a level one or level two rated EV charger. The charger must be separately metered from all other electrical loads.
The member is responsible for the cost of installing the meter on an outside location readily accessible to Cooperative personnel and for providing time-of-use control equipment.
Monthly rate
-
Sub-metered Energy 10:00 P.M. to 6:00 A.M. $.051/kWh
-
Sub-metered Energy 6:00 A.M. to 10:00 P.M $.1025/kWh
-
Sub-meter Charge per Month $5.00
For more information please contact DVEC at 1-800-342-4671 and ask to speak to one of our meter technicians.